Maryland Condominium Repair Reserve Fund Law Enacted for Montgomery and Prince George’s Counties

The sudden collapse of the 12-story Champlain Tower South Condominium in Surfside, Florida has focused attention on the need for all condominiums to determine and fund the long-term needs for repair and replacement of structural common components such as roofs, foundations, and walls, as well as the common plumbing, electrical and mechanical systems.

A prudent condo board should periodically obtain information regarding the estimated remaining life of each common property component and the estimated cost for future repair and replacement. Known as a “reserve study”, this evaluation should be performed by an independent construction professional. Based on the future estimated repair costs, the board should accumulate “reserve funds” as part of the annual owner assessment to pay for repairs when needed.

Recent changes in Maryland law now require all condos, housing cooperatives and homeowner associations in Montgomery County and Prince George’s County to obtain a reserve study every 5 years and to include funds for recommended repairs in the annual association budget. Prince George’s County and Montgomery County, bordering Washington D.C., are the 2 most populous Maryland counties with nearly 2 million total residents.

Continue reading

Replacement Reserve Funding Required for Condos and HOAs in Prince George’s County, Maryland

A reserve study to determine the funding needed for future major repairs and replacement of common property in condominiums, homeowner associations and housing cooperatives in Prince George’s County, Maryland will now be required by a new Maryland law, effective October 1, 2020.

The replacement reserve study must be prepared by a qualified professional and identify each structural, mechanical, electrical and plumbing component of the common property and any other components that are the responsibility of the condo, HOA or coop to repair and replace. It must also state the normal useful life and estimated remaining useful life of each component; state the estimated cost of repair or replacement; and state the estimated annual reserve amount necessary to accomplish any future repair or replacement.

Continue reading